Joinery: stairs, kitchens, doors

The parts of the building people touch — stairs wedged solid, doors with even gaps, kitchens fitted to surveyed walls.

Joinery: stairs, kitchens, doors — Internal Finishes

Last updated 2026-07-28 by the BuildPedia Editorial Team.

What is Joinery: stairs, kitchens, doors?

Stairs go in late enough to escape the worst of the damage and early enough to give safe access — fixed to the landings, wedged and glued until nothing creaks, then immediately sheeted and handrailed, because an unprotected staircase on a live site is a magnet for every dumper of plaster and crate of tiles. Rises and goings are checked for consistency; the bottom tread that differs from the rest is the one someone trips on in year five.

Doorsets arrive dimensioned from the factory and the site's job is to hang them honestly: frames plumb in openings checked after plaster, consistent gaps around the leaf, ironmongery aligned so latches click home without a shoulder. Fire doors carry their certificate's tolerances — gap limits, threshold clearances, the right seals and closers — and a fire door hung outside its certificate is a very expensive ordinary door. In a still-drying building, timber moves, so gaps are set with margin and doors are re-checked before handover.

Kitchens are fitted to surveyed walls, never to drawings of walls. Units are levelled to a datum and fixed, worktops templated and jointed, sinks sealed, appliances connected to the points first fix prepared. Then skirtings, architraves and the second-fix joinery run to the datum lines, with mitres and scribes tight — joinery is the tactile quality of the building, and the handrail, the door swing and the worktop joint are what the occupant touches every single day.

How does Joinery: stairs, kitchens, doors work, step by step?

Step 1: Survey the openings and rooms

Survey the openings and rooms — Joinery: stairs, kitchens, doors, step 1

Door openings are measured after plaster; kitchens are surveyed with the service positions confirmed against the first-fix photographs. Joinery fitted to un-surveyed walls inherits every error the plasterer made.

Step 2: Install and protect the stairs

Install and protect the stairs — Joinery: stairs, kitchens, doors, step 2

Stairs are fixed, wedged and glued, treads checked for level and consistent rise and going. Protection — sheeting, edge guards, temporary handrail — goes on immediately and is policed until the area is released.

Step 3: Hang the doorsets

Hang the doorsets — Joinery: stairs, kitchens, doors, step 3

Frames are set plumb, leaves hung with consistent gaps, latches and keeps aligned. Fire doors are verified against their certificate — gaps, seals, closers, glazing and ironmongery — and tagged or recorded as the scheme requires.

Step 4: Fit the kitchens

Fit the kitchens — Joinery: stairs, kitchens, doors, step 4

Units are levelled to a datum line and fixed, worktops jointed and sealed, sinks and appliances connected to the prepared points. The finished run is checked level end to end and every door and drawer adjusted before sign-off.

Step 5: Fix the second-fix joinery

Fix the second-fix joinery — Joinery: stairs, kitchens, doors, step 5

Skirtings and architraves run to the datum lines with mitres and scribes tight; window boards, shelving and boxing follow. The workmanship standard is set on the first room and inspected there.

Step 6: Adjust, snag and protect

Adjust, snag and protect — Joinery: stairs, kitchens, doors, step 6

Doors are re-checked as the building dries and adjusted before they bind; worktops and treads stay protected until release. A finished floor nobody controls is a finished floor nobody owns.

What are the benefits of Joinery: stairs, kitchens, doors?

What are the limitations of Joinery: stairs, kitchens, doors?

What is Joinery: stairs, kitchens, doors best suited for?

What plant does Joinery: stairs, kitchens, doors need?

How is Joinery: stairs, kitchens, doors quality-checked?

Related processes